topads

Click Tittle [or] Image Full View Images,,,categories,,,,,

Click here tittle view original high quality

Name:

300 x 250 - newxpwallpaper: Run-of-site - Do not modify

Tag content:





Adding a custom query string: insert &YOUR_CUSTOM_QUERY_STRING at the end of the SRC attribute in the tag above.
Use the &PUB_URL provided at the end of the SRC attribute in the tag above when another ad server may
inadvertently mask Referring URL from Right Media. Please refer to KB Article for further details.

Sunday, 20 November 2011

Diavik Mine top10 holes in worlds walls new xp wallpapers


The Diavik Diamond Mine is a diamond mine in the North Slave Region of the Northwest Territories, Canada, about 300 kilometres (190 mi) north of Yellowknife.[1] It has become an important part of the regional economy, employing 700, grossing C$100 million in sales, and producing 8 million carats (1,600 kg (3,500 lb)) of diamonds annually. The area was surveyed in 1992 and construction began in 2001, with production commencing in January 2003. It is connected by an ice road and Diavik Airport with a 5,235 ft (1,596 m) gravel runway regularly accommodating Boeing 737 jet aircraft.
The mine is owned by a joint venture between the Harry Winston Diamond Corporation and Diavik Diamond Mines Inc., a subsidiary of Rio Tinto Group. The lifespan of the mine is expected to be 16 to 22 years.
The mine consists of three kimberlite pipes associated with the Lac de Gras kimberlite field and is located on an island 20 km2 (7.7 sq mi) in Lac de Gras and is informally called East Island. It is about 220 km (140 mi) south of the Arctic Circle.
In 2006 the ice road from Yellowknife to the Diavik mine, and neighbouring mines, froze late and thawed early.[2] The Diavik mine was unable to truck in all the supplies needed for the rest of 2006 before the road closed and arrangements had to be made to bring the remainder of the supplies in by air.
On July 5, 2007 a consortium of seven mining companies, including Rio Tinto, announced they are sponsoring environmental impact studies to construct a deep-water port in Bathurst Inlet.[3][4] Their plans include building a 211 km (131 mi) road connecting the port to their mines. The port would serve vessels of up to 25,000 tonnes.
In March 2010, underground mining began at the mine. The transition from open pit to underground mining is expected to be completed by 2012.

0 comments:

Post a Comment

Name:

300 x 250 - newxpwallpaper: Run-of-site - Do not modify

Tag content:





Adding a custom query string: insert &YOUR_CUSTOM_QUERY_STRING at the end of the SRC attribute in the tag above.
Use the &PUB_URL provided at the end of the SRC attribute in the tag above when another ad server may
inadvertently mask Referring URL from Right Media. Please refer to KB Article for further details.

Category